eONPUIR

Risk Management with Lean Methodology

Показать сокращенную информацию

dc.contributor.author Komleva, Nataliia
dc.contributor.author Комлева, Наталія Олегівна
dc.contributor.author Комлева, Наталья Олеговна
dc.contributor.author Kobets, Vitaliy
dc.contributor.author Liubchenko, Vira
dc.contributor.author Любченко, Віра Вікторівна
dc.contributor.author Любченко, Вера Викторовна
dc.contributor.author Zinovatna, Svitlana
dc.contributor.author Зіноватна, Світлана Леонідівна
dc.contributor.author Зиноватна, Светлана Леонидовна
dc.contributor.author Kobets, Vitaliy
dc.contributor.author Кобець, Віталій
dc.contributor.author Кобец, Виталий
dc.date.accessioned 2021-03-22T12:27:19Z
dc.date.available 2021-03-22T12:27:19Z
dc.date.issued 2020-10
dc.identifier.citation Komleva, N., Liubchenko, V., Zinovatna, S., Kobets, V. (2020). Risk Management with Lean Methodology. Proceedings of 1st International Workshop on Computational & Information Technologies for Risk-Informed Systems (CITRisk-2020), Ukraine, Kherson, 15-16 October 2020, Vol. 2805, p. 266–281. en
dc.identifier.citation Risk Management with Lean Methodology / N. Komleva, V. Liubchenko, S. Zinovatna, V. Kobets // Proceedings of 1st International Workshop on Computational & Information Technologies for Risk-Informed Systems (CITRisk-2020), Ukraine, Kherson, 15–16 October 2020. 2020. – Vol. 2805. – P. 266–281. en
dc.identifier.uri http://ceur-ws.org/Vol-2805/paper20.pdf
dc.identifier.uri http://dspace.opu.ua/jspui/handle/123456789/11450
dc.description.abstract In this paper, we propose to use the Lean Methodology to reduce losses due to the uncertainty of possible solutions during the execution of a process that results in a valuable product. According to the Lean principle of amplify learning, risk management is implemented using feedback from process participants in short time intervals. Each such interval is represented by a cycle with stages build-measure-learn; the reaction of process participants in the learning stage improves the build stage in the next iteration. We propose to perform a hierarchical decomposition of risks and introduce two categories of risks: final risk, which corresponds to losses due to uncertainty in the outcome of decisions and indicated risk, which means the deviation of process characteristics from the planned normative values. Two types of characteristics are considered: observable characteristics, which can be directly measured when the increment is reached, and unobservable characteristics related to consumers’ perception of the increment and can be evaluated through surveys. The mechanism for evaluating individual characteristics of the process iteration, aggregating the critical values for all characteristics, and obtaining the indicated risk level based on them is proposed. Options for determining the final risks based on the obtained levels of indicated risks are proposed. en
dc.language.iso en_US en
dc.subject Risk-based Decision-making Process en
dc.subject Lean Iterative Process en
dc.subject Decomposition of Risks en
dc.subject Final Risk en
dc.subject Indicated Risk en
dc.title Risk Management with Lean Methodology en
dc.type Article en
opu.kafedra Кафедра системного програмного забезпечення uk
opu.citation.firstpage 266 en
opu.citation.lastpage 281 en
opu.citation.conference 1st International Workshop on Computational & Information Technologies for Risk-Informed Systems (CITRisk-2020) en
opu.staff.id lvv@opu.ua en
opu.staff.id zinovatnaya.svetlana@opu.ua en
opu.staff.id komleva@opu.ua en
opu.conference.dates October 15-16, 2020 en


Файлы, содержащиеся в элементе

Этот элемент содержится в следующих коллекциях

Показать сокращенную информацию