eONPUIR

Metrological support of design processes using the “Big Bang” information model

Показать сокращенную информацию

dc.contributor.author Oborskyi, Hennadii
dc.contributor.author Оборський, Геннадій Олександрович
dc.contributor.author Stanovska, Iraida
dc.contributor.author Становська, Іраіда Іванівна
dc.contributor.author Prokopovych, Ihor
dc.contributor.author Прокопович, Ігор Валентинович
dc.contributor.author Tonkonogyi, Volodymyr
dc.contributor.author Тонконогий, Володимир Михайлович
dc.contributor.author Stanovskyi, Olexandr
dc.contributor.author Становський, Олександр Леонідович
dc.contributor.author Shvets, Pavlo
dc.contributor.author Швець, Павло Степанович
dc.date.accessioned 2022-08-24T19:44:08Z
dc.date.available 2022-08-24T19:44:08Z
dc.date.issued 2022
dc.identifier.citation Oborskyi, H., Stanovska, I., Prokopovych, I., Tonkonogyi, V., Stanovskyi, O., Shvets, P. (2022). Metrological support of design processes using the “Big Bang” information model. Odes`kyi Polytechnichnyi Universytet, Pratsi, 1 (65), 109–116. en
dc.identifier.citation Metrological support of design processes using the “Big Bang” information model / H. Oborskyi, I. Stanovska, I. Prokopovych, V. Tonkonogyi, O. Stanovskyi, P. Shvets // Пр. Одес. політехн. ун-ту. – Одеса, 2022. – Вип. 1 (65). – P. 109–116. en
dc.identifier.issn 2076-2429
dc.identifier.uri http://dspace.opu.ua/jspui/handle/123456789/12945
dc.description.abstract Навіть найпростіші проектні роботи виконуються, як правило, проектною установою, яка залучає до цих робіт кілька проектувальників різної кваліфікації. Тому, практично, кожне проектування розпадається на декілька проектних робіт (підпроектів), що виконуються послідовно- паралельно із постійним погодженням вплину окремих підпроектів. Деякі елементи при цьому не проектуються в загальному сенсі. Їхні результати переносяться до переліку «покупних» елементів та вузлів (кріплення, стандартні вузли, тощо). Звідси випливає проблема оптимізації таких елементів із проектованими частинами та забезпечення можливості безпосередньо їх «купити». Під час проектування конструктора спіткають різні несподіванки або ризики, які також можуть суттєво змінити хід та результат проектування. Тому під час проектування необхідно враховувати не тільки обмеження, які накладаються «внутрішніми» обставинами, які зазвичай незмінні, але й змінними «зовнішніми» обставинами, до яких зокрема можна віднести: обмеження, які випливають із змінними умовами експлуатації майбутнього об’єкта проектування; технологічні обмеження, пов’язані із конкретними можливостями організації, яка буде впроваджувати проект в життя; фінансові обмеження; часові обмеження; тощо. В залежності від ступеню розпаралелювання окремих підпроцесів проектування загальний процес може розглядатися як послідовний, частково паралельний або паралельний. Накладаючись один на одне, ці обмеження створюють унікальне та химерне тло, створюючи передумови для поглиблення оптимізації. На цьому тлі можуть бути побудовані нові моделі та об’єкти проектування, наприклад, космогонічна модель Великого вибуху. Запропоновано модель опису проектного простору та оцінено можливості трансформації останнього під час оптимізації процесу проектування за інформаційною моделлю «Великого вибуху». Створено та проаналізовано поняття «протомодель» в якості першої «редакції» багатовимірної морфологічної інформаційної моделі процесу проектування. В Центрі реконструктивної та відновної медицини були проведені випробування антикризової системи проектування оптимального процесу прийняття проектних рішень в медичній практиці. Випробування показали, що її використання дозволило досягти значних результатів стосовно якості медичного обслуговування. en
dc.description.abstract Even the simplest design work is performed, as a rule, by a design institution, which involves several designers of different qualifications. Therefore, practically, each design is divided into several design works (subprojects), which are performed sequentially and in parallel with the constant coordination of the impact of individual subprojects. Some elements are not designed in the general sense. Their results are transferred to the list of “purchased” elements and components (fasteners, standard components, etc.). Hence the problem of optimizing such elements with the designed parts and providing the opportunity to directly “buy” them. During the design of the designer there are various surprises or risks that can also significantly change the course and outcome of the design. Therefore, the design must take into account not only the constraints imposed by “internal” circumstances, which are usually unchanged, but also the variable “external” circumstances, which include: constraints arising from the changing operating conditions of the future design object; technological limitations related to the specific capabilities of the organization that will implement the project; financial constraints; time restrictions; etc. Depending on the degree of parallelization of individual design subprocesses, the overall process can be considered as sequential, partially parallel or parallel. Overlapping, these constraints create a unique and whimsical background, creating the preconditions for deepening optimization. Against this background, new models and design objects can be built, such as the cosmogonic model of the Big Bang. The model of the project space description is offered and the possibilities of the latter transformation during the optimization of the design process according to the information model of the “Big Bang” are estimated. The concept of “protomodel” as the first “edition” of multidimensional morphological information model of design process is created and analyzed. The Center for Reconstructive and Reconstructive Medicine conducted tests of the anti-crisis system of designing the optimal process of making design decisions in medical practice. Tests have shown that its use has achieved significant results in terms of quality of care. en
dc.language.iso en en
dc.publisher Одеса: [б. в.] en
dc.subject моделі об’єктів та процесів проектування en
dc.subject оптимізація підпроектів en
dc.subject «Великий вибух» en
dc.subject медичне обслуговування en
dc.subject models of objects and design processes en
dc.subject optimization of subprojects en
dc.subject “Big Bang” en
dc.subject medical care en
dc.title Metrological support of design processes using the “Big Bang” information model en
dc.title.alternative Метрологічна підтримка процесів проектування за допомогою інформаційної моделі «Великого вибуху» en
dc.type Article en
opu.kafedra Кафедра вищої математики та моделювання систем uk
opu.kafedra Кафедра інформаційних технологій проєктування та дизайну uk
opu.kafedra Кафедра інтегрованих технологій управління uk
opu.kafedra Кафедра електропостачання та енергетичного менеджменту uk
opu.citation.journal Праці Одеського політехнічного університету en
opu.citation.firstpage 109 en
opu.citation.lastpage 116 en
opu.citation.issue 1(65) en
opu.staff.id oborsky@op.edu.ua
opu.staff.id stanovska@op.edu.ua
opu.staff.id i.v.prokopovich@op.edu.ua
opu.staff.id vmt@op.edu.ua
opu.staff.id stanovsky@op.edu.ua
opu.staff.id shvets.p.s@op.edu.ua


Файлы, содержащиеся в элементе

Этот элемент содержится в следующих коллекциях

Показать сокращенную информацию