eONPUIR

Application of models and methods of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and behavioral economics

Показать сокращенную информацию

dc.contributor.author Bedrii, Dmytro
dc.contributor.author Danchenko, Elena
dc.contributor.author Semko, Inga
dc.date.accessioned 2021-10-31T17:26:39Z
dc.date.available 2021-10-31T17:26:39Z
dc.date.issued 2020-12-31
dc.identifier.citation Bedrii D., Danchenko E. & Semko I. Application of models and methods of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and behavioral economics. Technology audit and production reserves. Kharkiv, 2020. Vol. 6. Is. 2(56). P. 42-46. DOI: 10.15587/2706-5448.2020.220298. en
dc.identifier.issn 2664-9969
dc.identifier.uri http://dspace.opu.ua/jspui/handle/123456789/11907
dc.description.abstract The object of research is the processes of integrated risk management of stakeholders of scientific projects, including the project team, the main executors of the project (scientists) and other stakeholders, in conditions of uncertainty and behavioral economics. Today, scientists work in difficult conditions of uncertainty about the prospects for the development of science, technology and engineering. Therefore, it can lead to personnel risks, conflicts and behavioral economics and have a negative impact on the planning and implementation of scientific projects. The main hypothesis of the study is the assumption that the success of scientific projects depends on the effective management of their stakeholders in order to achieve their goals. It is necessary to systematically approach the analysis of stakeholders of scientific projects, the use of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and behavioral economics. Based on the analysis of risk management methods in different areas of activity and taking into account the conceptual model of integrated risk management of scientific projects, a method of integrated risk management of stakeholders of scientific projects in uncertainty and behavioral economics was proposed. For the practical application of the developed models and methods of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and behavioral economics, the scientific project was considered. Their use, even at the stage of initiating scientific projects, allowed the project manager and his/her team to calculate the indicator of «toxicity» for each alternative stakeholders and compare them with each other. It is based on data obtained in the process of assessing personnel risks, conflicts and factors of behavioral economics, which was conducted using the method of expert assessments. The indicator of «toxicity» is limited and should be close to zero. An example of choosing a stakeholder for the supply of stationery is considered. This result allowed to increase the efficiency of inclusion of stakeholders in the participants of the scientific project. en
dc.language.iso en en
dc.publisher ПП «Технологічний Центр» en
dc.subject scientific project en
dc.subject method of integrated risk management en
dc.subject increasing the efficiency of stakeholder management en
dc.subject «toxicity» indicator en
dc.title Application of models and methods of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and behavioral economics en
dc.type Professional article en
dc.type Article in Index Copernicus en
opu.citation.journal Technology audit and production reserves en
opu.citation.volume 6 en
opu.citation.firstpage 42 en
opu.citation.lastpage 46 en
opu.citation.issue 2(56) en
opu.staff.id bedrii@op.edu.ua en


Файлы, содержащиеся в элементе

Этот элемент содержится в следующих коллекциях

Показать сокращенную информацию