eONPUIR

Simulation modelling of sampling and replacement of coal suppliers for thermal power plants

Показать сокращенную информацию

dc.contributor.author Grishyn, Maksym
dc.contributor.author Грішин, Максим Володимирович
dc.contributor.author Гришин, Максим Владимирович
dc.contributor.author Tarakhtij, Olga
dc.contributor.author Тарахтій, Ольга Сергіївна
dc.contributor.author Тарахтий, Ольга Сергеевна
dc.date.accessioned 2023-07-07T13:16:43Z
dc.date.available 2023-07-07T13:16:43Z
dc.date.issued 2023-07-03
dc.identifier.citation Grishyn, M., Tarakhtij, O. (2023). Simulation modelling of sampling and replacement of coal suppliers for thermal power plants. Аpplied Aspects of Information Technology, Vol. 6, N 2, р. 175–189. еn
dc.identifier.citation Grishyn, M. Simulation modelling of sampling and replacement of coal suppliers for thermal power plants / M. Grishyn, O. Tarakhtij // Аpplied Aspects of Information Technology = Прикладні аспекти інформ. технологій. – Оdesa, 2023. – Vol. 6, N 2. – P. 175–189. еn
dc.identifier.issn 2617-4316
dc.identifier.issn 2663-7723
dc.identifier.uri http://dspace.opu.ua/jspui/handle/123456789/13906
dc.description.abstract This paper embarks to the persistent suboptimal coal quality issues experienced in thermal power plants that hinder operational efficiency and sustainability. The research is divided into three main segments: formulation of a transport problem, creationof a coal supplier selection model, and construction of a MATLAB Simulink® simulation for detecting and refusing low-grade coal. The proposed supplier selection model, important for thermal power plants, considers factors such as potential transport delays and the necessity of reserve refueling to prevent fuel shortages. This model is expected to decrease fuel shortages and enhance the reliability and efficiency of thermal power plants. Additionally, a coal quality detection model has been developed using a sampling approach based on the Cochran formula, aiming to increase defect detection accuracy, thus reducing the likelihood of utilizing poor-quality coal. The model's unique feature is its dynamic adjustment of coal sample selection based on combustion results, enabling real-time response to coal quality inconsistencies. Upon detecting poor-qualitycoal, the power plants promptly switch to an alternate supplier, minimizing operational disruptions. The validity of the models was confirmed via simulation on various examples en
dc.language.iso en en
dc.publisher Nauka i Tekhnika en
dc.subject Thermal power plants en
dc.subject coal quality en
dc.subject supplier selection en
dc.subject Cochran sampling formula en
dc.subject quality control en
dc.subject automatic control system en
dc.subject energy production sustainability en
dc.subject transportation delays en
dc.title Simulation modelling of sampling and replacement of coal suppliers for thermal power plants en
dc.title.alternative Імітаційне моделювання відбору проб та заміни постачальників вугілля натеплові електростанції uk
dc.type Article en
opu.citation.journal Applied Aspects of Information Technology en
opu.citation.volume 2 en
opu.citation.firstpage 175 en
opu.citation.lastpage 189 en
opu.citation.issue 6 en


Файлы, содержащиеся в элементе

Этот элемент содержится в следующих коллекциях

Показать сокращенную информацию