eONPUIR

Using YED software to visualize and analyze project management knowledge systems data

Показать сокращенную информацию

dc.contributor.author Lukianov, Dmytro
dc.contributor.author Gogunskii, Victor
dc.contributor.author Kolesnikov, Oleksii
dc.contributor.author Kolesnikova, Kateryna
dc.date.accessioned 2025-04-05T12:25:04Z
dc.date.available 2025-04-05T12:25:04Z
dc.date.issued 2021
dc.identifier.citation Lukianov D. Using YED software to visualize and analyze project management knowledge systems data / D. Lukianov, V. Gogunskii, O. Kolesnikov, K. Kolesnikova // CEUR Workshop Proceedings, 2021. - 217-226. en
dc.identifier.uri http://dspace.opu.ua/jspui/handle/123456789/15062
dc.description.abstract The article proposes to consider some conclusions about the significance of a number of elements of the model of individual competencies of project managers proposed by the International Project Management Association (IPMA ICB 4.0) when presented as a directed graph. It is proposed to consider elements of the competency model (a set of 28 elements for the ICB model for project management) as the vertices of such a graph. It is proposed to carry out a structural analysis of such a graph using various combinations of representations that combine the "centrality" parameter and "weight characteristics" for the vertices of such a graph based on information about the number of edges adjacent to the vertices. The article demonstrates the approach proposed by the authors to the analysis of a directed graph using software such as the openly distributed product yEd, which has sufficiently wide capabilities for visualizing various systems modeled with its help, including graphs. It is also proposed to consider, as an example of using such a representation, a variant of transforming the existing IPMA ICB 4.0 model based on the representations for this structure obtained during the visual analysis using the yEd service. The structure of the general communication system IPMA ICB 4.0 is clearly demonstrated, and the presentation of each of the blocks of elements of this model is also visualized. Shows the role of the element "Leadership" as an "integral element", directly through which communication is carried out between all blocks of the model of elements. The role of such an element as "Power and Interest" in the analysis of a directed graph using a set of representations is also highlighted, which demonstrates the structural relationships of the entire system of elements of the system under consideration using the "centrality" property. en
dc.language.iso en_US en
dc.subject Project management en
dc.subject competences model en
dc.subject International Project Management Association en
dc.subject Individual Competence Baseline en
dc.subject adjacency matrix en
dc.subject directed graph en
dc.subject theory of graphs en
dc.subject centrality en
dc.subject visual analyses en
dc.subject modeling en
dc.title Using YED software to visualize and analyze project management knowledge systems data en
dc.type Article en
opu.citation.firstpage 217 en
opu.citation.lastpage 226 en


Файлы, содержащиеся в элементе

Этот элемент содержится в следующих коллекциях

Показать сокращенную информацию