Пожалуйста, используйте этот идентификатор, чтобы цитировать или ссылаться на этот ресурс: http://dspace.opu.ua/jspui/handle/123456789/13904
Название: Increasing the accuracy of electricity accounting by digital information-measuring systems
Другие названия: Підвищення точності обліку електроенергії цифровими інформаційно-вимірювальними системами
Авторы: Vasylets, Kateryna
Василець, Катерина Сергіївна
Василец, Екатерина Сергеевна
Vasylets, Sviatoslav
Василець, Святослав Володимирович
Василец, Святослав Владимирович
Ключевые слова: Electricity meter
measurement uncertainty
reduced load
current transformers
Дата публикации: 3-Июл-2023
Издательство: Nauka i Tekhnika
Библиографическое описание: Vasylets, K., Vasylets, S. (2023). Increasing the accuracy of electricity accounting by digital information-measuring systems. Аpplied Aspects of Information Technology, Vol. 6, N 2, р.151–162.
Vasylets, K. Increasing the accuracy of electricity accounting by digital information-measuring systems / K. Vasylets, S. Vasylets // Аpplied Aspects of Information Technology = Прикладні аспекти інформ. технологій. – Оdesa, 2023. – Vol. 6, N 2. – P. 151–162.
Краткий осмотр (реферат): Significant non-technological losses of electricity are observed in 0.38 kV distribution networks, which lead to financial dam-ages of energy supply companies. The reason for their occurrence is the deficiencies in the accountingunits functioning inthe re-duced load mode, which occurs during the downtime of the main technological equipment. The purpose of the study is to increase the accuracy of electricity measurement by a commercial accountingunit in the reduced load mode based on mathematical modeling of measurement uncertainty. Evaluation of regression parameters for the static characteristics of measuring current transformersin the reduced load mode is carried out using the covariance analysis methods and analysis of regression residuals. Estimation of the non-random uncertainty of electricity measurementby one measuring channel of theaccountingunit was carried out using the fuzzy set theory. The polynomial approximation of the experimental values of the membership function for the measured quantity was carried out according to the maximum norm method. The least square method was used to approximate the boundaries of fuzzy functions. As a result of research, a universal static characteristic of a measuring current transformer of a certain accuracy class was obtained at a reduced primary current. It was established that the sample estimates uncertainty of the current transformer error of the 0.5 S accura-cy class changes from ±11.7% to ±1.7%. The uncertainty of electricity measurement by the commercial accountingunit in the re-duced load mode is proposed to be estimated by a fuzzy function. The developed mathematical model takes into account the depend-ence of the fuzzy interval boundaries, which characterizes the measurement result, on the phase currents asymmetric values. Compar-ison of the analytically obtained membership function for the relative deviations of the readings of the accountingunits with the em-pirically obtained value of such a deviation made it possible to establish the limitvalue of the confidence level, which was not less than 0.54 at the minimum permissible value of 0.4 of the adequacy criterion. This confirms the adequacy of the results of mathemati-cal modeling with experimental data. Estimating the electricity metering uncertainty with a fuzzy interval increases the accuracy of the measurement, as it allows clarifyingthe monthly electricity consumption by taking into account the energy that was consumed during the reduced load mode.
URI (Унифицированный идентификатор ресурса): http://dspace.opu.ua/jspui/handle/123456789/13904
ISSN: 2617-4316
2663-7723
Располагается в коллекциях:2023, Vol. 6, № 2

Файлы этого ресурса:
Файл Описание РазмерФормат 
183-Article Text-418-1-10-20230705.pdf799.96 kBAdobe PDFПросмотреть/Открыть


Все ресурсы в архиве электронных ресурсов защищены авторским правом, все права сохранены.